详细地介绍了天铁2800m3高炉的结构及开炉至达产的生产过程。总结了高炉生产中的经验及应注意的问题。通过采取狠抓管理,稳定原燃料,减少设备故障率,精心调剂炉况等措施,开炉一个月后顺利达产。
The paper introduces in detail the structure and production process from startup to arriving the capacity for Tiantie 2,800 m3 Blast Furnace,and summarizes the problems of practice and matters needing attention during blast furnace production. The blast furnace smoothly arrives at the capacity just in a month after startup through measures of enhancing management,stabilizing raw material and fuel,lowering equipment failure rate and elaborately regulating furnace status.