摘要
介绍了强化混凝与人工湿地的处理机理;采用强化混凝—人工湿地相结合解决了小城镇污水处理率低的问题,为小城镇污水处理提供了技术要求和保证。最后指出强化混凝—人工湿地具有的各种优缺点并进行展望。
Enhanced coagulation and the constructed wetland processing mechanism was Introduced. Enhanced coagulation and constructed wetland was used to solve the small cities sewage processing rate low problem. It was provided the specification and the guarantee for small cities. Finally, it pointed out that enhanced coagulation and construction wetland had various advantages and disadvantages.
出处
《水科学与工程技术》
2009年第6期60-62,共3页
Water Sciences and Engineering Technology
关键词
强化混凝
人工湿地
机理
小城镇
enhance coagulation
construction wetland
mechanism
small cities