裂解炉桩基基础方案比较

COMPARISON OF PILE FOUNDATIONS FOR CRACKING FURNACE
下载PDF
导出
摘要 通过对裂解炉桩基基础设计方案的比较,说明对于新建单台裂解炉,如果其上部重量大于下部重量,荷载重心与桩基承台形心之间有比较大的距离,桩布置不能简单地采用均匀布置,而应考虑桩基与上部结构的共同作用。通过调整桩布置间距,控制好承台厚度并在两个方向的轴线上配置暗梁的方法,以达到控制沉降的目的。 By comparing two pile foundations for cracking furnace, this paper indicates that if the upper weight of a new single cracking furnace is higher than its lower weight and the space between the load center and the center of pile foundation is relatively big,the combined action of file foundation and upper frame should be taken into consideration instead of adopting uniform arrangement of piles.The sedimentation can be con- trolled by adjusting the distance between piles,controlling the thickness of foundation and designing hidden beams along the axis lines in two directions.
作者 陈春 毛耀庭
出处 《乙烯工业》 CAS 2009年第4期46-49,共4页 Ethylene Industry
关键词 裂解炉 桩基 Cracking furnace Pile Pile foundation
  • 相关文献

参考文献3

  • 1史佩栋.实用桩基工程手册[M],北京:中国建筑工业出版社,1995.
  • 2JGJ 94-2008,建筑桩基技术规范[S].
  • 3GB50011-2001.建筑抗震设计规范[S].[S].,..

共引文献3337

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部