摘要
针对砂性土地层盾构出洞难的问题,结合工程实例,详细介绍了冻结计算、施工工艺及有关问题,实践证明其效果良好。
Aiming at the difficult problem of shield unkenneling in sandy silt, combined with specific project, this paper introduces the freezing calculation construction techniques and some relevant questions in the shield construction. It has made the good construction effects.
出处
《铁道建筑技术》
2009年第12期48-50,102,共4页
Railway Construction Technology
关键词
冻结法
砂性土
盾构出洞
freezing method
sandy silt
shield unkenneling