摘要
穿越长江干堤的取水工程施工,容易引发各种险情,必须慎重,提前做好准备工作,提出各种整险加固预案,确保施工的顺利进行和江堤的安然无恙。
Crossing the primary dyke of Yangtze River, the water intaking project which tends to induced dangers, must be considered fully and prepared well in advance. Some schemes were proposed to keep the construction and dyke sound and safe.
出处
《长江工程职业技术学院学报》
CAS
2009年第4期31-32,共2页
Journal of Changjiang Institute of Technology
关键词
穿越江堤
险情
原因分析
整险加固
dyke crossing
dangers
analysis of causes
remediation and strengthenning