摘要 以某冷轧带钢厂现役50 t×33 m桥式起重机为研究对象,采用有限元法对桥式起重机桥架结构进行了应力分析。结果表明,主梁跨中焊缝应力最大,且存在严重应力集中,是桥式起重机的主要裂纹源,亦是桥式起重机在承载能力方面的薄弱环节。 To study frequent crack accident of the overhead traveling crane,a 50 t×33 m overhead traveling crane of a cold rolling mill plant was investigated.The stress and stain distribution of the bridge structure was analyzed with finite element method(FEM).The analysis shows that the welded seams in mid-span,suffering from the highest stress and severe stress concentration,are primary crack initiation sites and influence most the increase of carrying capacity of the overhead traveling crane.
出处 《武汉科技大学学报》 CAS 2009年第6期623-626,共4页 Journal of Wuhan University of Science and Technology
基金 湖北省中青年科技创新团队计划资助项目(T200905)
关键词 桥式起重机 有限单元法 裂纹 overhead traveling crane FEM crack
  • 相关文献

参考文献8

二级参考文献30

共引文献48

同被引文献45

引证文献12

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部