济钢一炼铁为了解决350m3高炉电动泥炮推力不足的问题,将电动泥炮的打泥机构改造为液压打泥机构,满足了生产要求。
No.1 ironmaking plant of Jinan iron and steel group general corporation transformed the clay extruded mechanism of electrical clay gun into the hydraulic clay extruded mechanism for overcoming insufficient thrust of electrical clay gun of 350m 3 blast furnace.The implementation of this measure has satisfied the need of the production.