期刊文献+

金州湾大桥主桥120+120m斜拉桥施工监控

Monitoring of Construction of cable-Stayed Bridge with 120 and 120m of Jinzhouwan bridge's main Bridge
下载PDF
导出
摘要 斜拉桥施工监控就是控制施工过程中和成桥状态时结构的内力和线形,以使斜拉桥的成桥状态充分满足设计要求。以金州滨海大桥工程施工监控为背景,主要介绍了施工监控的过程,对施工过程采取了仿真模拟计算并对结果进行了分析。 Monitoring of cable - stayed bridge constrruction is to control the internal force and alignment in the course of construction and during bridge formation in order to the stote of cable - stayed bridge formation fully meets design requirements. As background with monitoring of Jinzhoubinhai bridge project construction, the paper chiefly introduces process of construction monitoring, calculates the construction process with emulation - simu - lation and makes analysis of results.
作者 于传君
出处 《北方交通》 2009年第12期21-23,共3页 Northern Communications
关键词 施工监控 调索 仿真计算 Construction monitoring Cable regnlation Emution calculating
  • 相关文献

参考文献2

  • 1徐君兰.大跨度桥梁施工控制(土木工程专业用)[M].北京:人民交通出版社,2002.
  • 2JTJ D62-2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].

共引文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部