困难山区铁路工程布局设计研究 被引量:4

Research on the Engineering Arrangement Design for Railways in Difficult Mountain Area
下载PDF
导出
摘要 研究目的:铁路建设是一项百年工程,尤其是桥隧比重大的山区铁路,各类工程所遇到的地质问题更具复杂性和多样性。因此,对困难山区铁路工程布局设计提出了更高的要求。本文对一条铁路线的桥梁、隧道、路基工程布局设计进行总结,以指导选线和工程处理,力求系统设计最优。研究结论:为了能使困难山区铁路工程建设做到技术可行、经济合理、安全可靠,工程布局设计要纠正"重桥隧、轻路基"的思想,避免出现南昆线、内昆线中桥隧工程布局"偏紧、偏少"的现象,减少"假路基",对可能出现工程病害的高填、深挖及重大不良地质地段,应经桥隧与路基方案综合比选后,考虑经济合理、技术稳妥及安全等因素择优选用,从而降低施工运营风险。 Research purposes : Railway construction is a project for long - term service. Especially construction of the railway in mountain areas with lots of bridges and tunnels will encounter the more complicated and diversified geological conditions. Therefore, higher requirement is brought out to the engineering arrangement design for railways in mountain areas. This paper sums up the arrangement design of bridge, tunnel and subgrade for one railway for the purpose of providing certain guidance for alignment and engineering treatment so as to optimize the systematic design. Research conclusions: In order to make railway construction in mountain areas technically feasible, economically reasonable, safe and reliable, the engineering arrangement design thoughts of " giving priority to bridges & tunnels engineering rather than subgrade" must be corrected, the phenomenon of " concentrated and less" arrangement of bridges and tunnels appeared in Nanning- Kunming Railway and Neijiang- Kunming Railway should be avoided, and the " pretend suhgrade" should be reduced. To any section featured by high filling, deep excavation or major unfavorable geological conditions that may cause engineering diseases, selection should be made following the comparison of schemes of bridges & tunnels and subgrade comprehensively and taking the factors into account such as rationality in economy, soundness in technology, and safety so as to lower the risk of railway construction and operation.
作者 卓建成
出处 《铁道工程学报》 EI 北大核心 2009年第12期5-7,16,共4页 Journal of Railway Engineering Society
关键词 困难山区 铁路 工程布局 difficult mountain area railway engineering arrangement
  • 相关文献

参考文献9

二级参考文献14

  • 1赵月霞.铁路建设与城市环境[J].铁道经济研究,2005(4):44-46. 被引量:7
  • 2GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 3GB50090-99.铁路线路设计规范[S].[S].,..
  • 4GB50330-2002.建筑边坡工程技术规范[S].[S].,..
  • 5TB10003-2005.铁路隧道设计规范[S].[S].,..
  • 6GBJ2960-74,铁路工程技术规范·线路[S].
  • 7GBJ90—85,铁路线路设计规范[S].
  • 8CB50090-2006,铁路线路设计规范[S].
  • 9铁路工程设计技术手册·线路[M].北京:中国铁道出版社,1993.
  • 10赵清为.铁路工程设计技术手册·线路[K].北京:中国铁道出版社,1994.

共引文献428

同被引文献22

  • 1胡海勇,李永妮.浅谈海外EPC总承包项目的设计管理[J].公路交通科技(应用技术版),2011,7(2):207-210. 被引量:13
  • 2黄三强.地质选线在赣龙铁路扩能改造工程选线中的应用[J].铁道勘察,2010,36(6):69-73. 被引量:3
  • 3赵月霞.铁路建设与城市环境[J].铁道经济研究,2005(4):44-46. 被引量:7
  • 4铁鉴函[2004]655号,关于改建铁路黔桂线扩能改造工程初步设计的批复[S].
  • 5张雪才,等.改建铁路黔桂线预可行性研究报告[R].成都:铁道部第二勘测设计院,2001.
  • 6王南,邓军桥,等.改建铁路黔桂线可行性研究报告[R].成都:铁道第二勘察设计院,2003.
  • 7林世金,邓军桥,等.改建铁路黔桂线初步设计[Z].成都:铁道第二勘察设计院,2004.
  • 8黄波,等.改建铁路黔桂线施工图[Z].成都:铁道第二勘察设计院,2006.
  • 9王毅,黄波,等.改建铁路黔桂线施工图[Z].成都:铁道第二勘察设计院,2006.
  • 10铁鉴函[2004]655号,关于《黔桂线扩能改造初步设计审查批复意见》[S].

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部