期刊文献+

RBC控制能力及其布置方案分析 被引量:3

Analyses of RBC Control Ability and Its Arrangement Scheme
下载PDF
导出
摘要 研究目的:RBC系统是CTCS-3级列控系统核心地面子系统。随着CTCS-3级客运专线工程建设的加快,针对单个RBC的控制能力与RBC的设置原则进行研究很有必要。研究结论:在阐述RBC系统特点及组成的基础上,通过对RBC系统控制对象、控制范围及处理时间的分析,结合RBC控制能力相关因素的讨论,提出了单个RBC系统控制能力的制约模型;参照相关规范中对RBC的技术指标要求,提出了RBC设置原则和RBC布置公式。并可为类似工程提供借鉴。 Research purposes: RBC is the core ground subsystem of the CTCS- 3 train control system. With speeding up the construction of the passenger dedicated line with CTCS -3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle. Research conclusions: Based on the description of the RBC system ~s characteristics and components, analyses of the controlled objects and controlled range of RBC and the processing time, and discussion on the corresponding sectors related to RBC system control ability, the restricted model for individual RBC control ability is given. By referencing the technical indexes stipulated in relative code for RBC system, the RBC arrangement principle and formula are presented, which can provide the reference to the similar engineering works.
作者 彭传贤
出处 《铁道工程学报》 EI 北大核心 2009年第12期72-76,共5页 Journal of Railway Engineering Society
关键词 RBC系统 控制能力 模型 布置公式 RBC system control ability model arrangement formula
  • 相关文献

共引文献5

同被引文献10

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部