以鞍钢三烧改造工程中的带冷机基础混凝土的施工为例,讨论要求达到S8抗渗标号的冬期负温施工问题。分析此种混凝土的防冻机理,采取综合技术措施可获得预期效果。
Take the example of Third Sintering Manufacture of Anshan Iron and Steel Complx,where waterproof concrete of band cooler foundation was constructed at -10~-22 ℃ in winter,and was required to reach S8 antibleeding label.Ther paper analyizes the coldproof and antibleeding of this kind of concrete,and the anticipative results with the combination methods.
出处
《鞍山钢铁学院学报》
1998年第3期42-44,共3页
Journal of Anshan Institute of Iron and Steel Technology
关键词
基础
防水混凝土
初期冻害
负温施工
foundation,waterproof concrete,band cooler,constructing at low temprature in winter