本工程装卸工艺系统流程改造施工,工期紧,施工场地狭窄,并要求在装卸系统不停产的情况下,实现拆旧建新。在实施过程中,通过多方案比较选定切实可行的施工方案;在确保施工质量和安全的前提下,尽可能降低施工成本、加快施工进度,以保证工程尽早发挥经济和社会效益。
The remolding construction period of handling technology system process is press and the field is narrow. It is required that the works of removing the old and building the new should be carried out under the condition without stopping the operation. The construction scheme should be selected on the guarantee of safty and quality of construction. Which can lower the construction cost and fast the speed of it as can as possible and make the project give the economic and social benefit as earlier as possible.