摘要 本工程装卸工艺系统流程改造施工,工期紧,施工场地狭窄,并要求在装卸系统不停产的情况下,实现拆旧建新。在实施过程中,通过多方案比较选定切实可行的施工方案;在确保施工质量和安全的前提下,尽可能降低施工成本、加快施工进度,以保证工程尽早发挥经济和社会效益。 The remolding construction period of handling technology system process is press and the field is narrow. It is required that the works of removing the old and building the new should be carried out under the condition without stopping the operation. The construction scheme should be selected on the guarantee of safty and quality of construction. Which can lower the construction cost and fast the speed of it as can as possible and make the project give the economic and social benefit as earlier as possible.
作者 周恒祥
出处 《港工技术》 2009年第6期14-17,共4页 Port Engineering Technology
关键词 矿石码头 装卸工艺流程 改造施工 ore terminal handling technology process remolding construction
  • 相关文献

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部