摘要
结合天津港东疆港区吹填造陆工程实践,通过对围海造陆各工序的分析,认为吹填和地基处理2道工序是影响工程进度的关键。针对超软粘土地基施工特点,提出新型塑料排水板打设装备的方案,该装备的开发对加快天津港吹填造陆进度具有重要意义。
Combining the construction practice in Dongjiang Distrtic of Tianjin Port, through the analysis on the each process of reclamation, it is considered the two processes namely the fill and foundation treatment are the key factors affecting the progress of the project. According to the construction characteristics on the ultra-soft clay foundation, the proposal of adopting a new generation of plastic drainage plate-based equipment was proposed. Developing such equipment has the significance to speed up the land reclamation for Tianjin Port.
出处
《港工技术》
2009年第6期33-34,共2页
Port Engineering Technology
关键词
吹填造陆
地基处理
塑料排水板打设装备
land reclamation
foundation treatment
plastic drainage plate-based equipment