软基加固新型排水板打设装备开发探讨 被引量:1

Discussion on Development of New Type of Drainage Plate-based Equipment for Consolidating Soft Soil Foundation
下载PDF
导出
摘要 结合天津港东疆港区吹填造陆工程实践,通过对围海造陆各工序的分析,认为吹填和地基处理2道工序是影响工程进度的关键。针对超软粘土地基施工特点,提出新型塑料排水板打设装备的方案,该装备的开发对加快天津港吹填造陆进度具有重要意义。 Combining the construction practice in Dongjiang Distrtic of Tianjin Port, through the analysis on the each process of reclamation, it is considered the two processes namely the fill and foundation treatment are the key factors affecting the progress of the project. According to the construction characteristics on the ultra-soft clay foundation, the proposal of adopting a new generation of plastic drainage plate-based equipment was proposed. Developing such equipment has the significance to speed up the land reclamation for Tianjin Port.
作者 单奕
机构地区 天津港建设公司
出处 《港工技术》 2009年第6期33-34,共2页 Port Engineering Technology
关键词 吹填造陆 地基处理 塑料排水板打设装备 land reclamation foundation treatment plastic drainage plate-based equipment
  • 相关文献

同被引文献17

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部