摘要 结合工程实践,介绍了印度尼西亚阿萨汉一级水电站引水隧洞在开挖与混凝土衬砌过程中测量的主要技术和方法,并就如何提高隧洞贯通精度、较好控制隧洞超欠挖问题提出了建议,探讨了断面收方技术在隧道围岩变形监测中的应用. The principal survey technique and method for excavation and concrete lining of the headrace tunnel in Asahan No.1 Hydroelectric Power Project are introduced based on construction practice.And the authors also give their own opinion on how to improve the breakthrough precision of tunnel to control underbreak and overbreak of tunnel excavation.Moreover,the application of statistic techinque to deformation monitoring of surrounding rock in the tunnel is discussed.
作者 万山雄 李维
出处 《三峡大学学报(自然科学版)》 CAS 2009年第6期36-39,共4页 Journal of China Three Gorges University:Natural Sciences
关键词 引水隧洞 贯通精度 收方技术 围岩变形监测 headrace tunnel breakthrough precision statistic technique deformation monitoring of surrounding rock
  • 相关文献

参考文献1

  • 1DL/T5173-2003.水电水利工程施工测量规范[S].

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部