灾后重建保障性公共项目快速建设机制研究 被引量:3

A Study on the Fast Construction Mechanism of Postearthquake Reconstruction Supportability Public Project
下载PDF
导出
摘要 集成CM模式与代建制为CM型代建制,建立了代建制项目治理层次和CM模式项目管理层次快速建设机制。通过基于"短名单"的CM型代建人快速选择机制和基于快速建设的项目风险分担与代建人报酬激励机制,从项目治理层次上解决快速建设问题。通过基于信息共享的CM型代建制快速信息处理机制,基于快速拨付的项目资金支付机制和基于伙伴关系模式的冲突监控与快速处理机制,从项目管理层次上解决快速建设问题。 This paper integrates CM system and agent construction system into CM agent construction system and establishes the fast construction mechanism by project governance level based on agent construction system and project management level based on CM system. By means of the fast selecting CM agent mechanism based on " short list" and the mechanism of project risk allocation and reward incentive, fast construction is solved from project governance level. By means of the mechanism of fast information processing based on information sharing, the payment mechanism based on rapid disbursement and the mechanism of fast inspection and resolution of conflict based on partnering, fast construction is solved from project management level.
出处 《软科学》 CSSCI 北大核心 2009年第12期1-4,8,共5页 Soft Science
基金 国家自然科学基金项目(70772058)
关键词 灾后重建 公共项目 代建制 CM模式 快速建设 post - earthquake reconstruction public project agent construction system construction management system fast construction
  • 相关文献

参考文献15

二级参考文献111

共引文献286

同被引文献21

  • 1尹贻林,胡杰.基于利益相关者核心价值分析的公共项目成功标准研究[J].中国软科学,2006(5):149-155. 被引量:42
  • 2略阳县财政局.关于对略阳县天津高级中学建设项目工程竣工财务决算的批复(略财建[2010]16号).
  • 3关于对略阳县天津职教中心建设项目工程竣工财务决算的批复(略财建[2010]17号).
  • 4关于对略阳县天津中医医院建设项目工程竣工财务决算的批复(略财建[2010]18号)[Z].2010.
  • 5DAV1DSON C H,JOHNSON C,LIZARRALDE G,et al.Truths and myths about community participation in post- -disaster housing projects[J].Habitat Intemational, 2007, 31 (3)100-115.
  • 6JOHNSON CASSIDY, LIZARRALDE G,DAVIDSON C H.A systems view of temporary housing projects in post-disaster reconstruction[J].Construction Management and Economics,2006,24(4):367-378.
  • 7HARTMAN F.T..Don't park your brain outside:A practical guide to improving shareholder value with SMAT project management[M].PA:Project management Institute, 2000: 369.
  • 8Patterson O, Well F, Patel K. The Role of Community in Disaster Response: Conceptual Models [ J ]. Population Research and Policy Review, 2009, 29 (2) : 127-141.
  • 9Mitchell R K, Agle B R, Wood D J. Toward a theory of stakeholder identification and salience: the principle of who and what really counts [J]. Academy of Management Review, 1997, 22 (4): 853-886.
  • 10Driseoll C, Starik M. The primordial stakeholder: advancing the conceptual consideration of stakeholder status for the natural environment [ J]. Journal of Business Ethics, 2004 (1): 55-73.

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部