摘要
结合工程实例,针对水下丁坝抛石不易控制的特点,采用不同定位措施和施工方法,在不增加成本的情况下成功完成了水下丁坝抛石施工,可供同行参考。
Combine an engineering solid example,aim at an underwater D dam to throw a stone don t easily control of characteristics, adopt a dissimilarity fixed position measure and construction method,successfully complete an underwater D dam to throw a stone under the sistuation that don t increase cost.
出处
《广东土木与建筑》
2009年第10期49-50,56,共3页
Guangdong Architecture Civil Engineering
关键词
水下丁坝抛石
定位
挖掘机
the underwater D dam throws a stone
position
scoop out machine