摘要
介绍了芙蓉河水电站隧洞的地质情况,论述了在断层破碎带施工中,采用"管超前、严注浆、短开挖、弱爆破、强支护、快封闭、勤测量、速反馈"的施工原则,和超前小管棚施工法的工艺流程和质量控制措施。
An introduction was made on the geological conditions of tunnel of Furonghe Hydropower Station located in Longsheng County of Guangxi. For the tunnel construction in shattered fault zone, the adopted construction principles include pilot support pipe, strict grouting injection, short-time of excavation, slight blasting, strong supports, rapid closing, frequent measuring, fast feedback. The technical process and quality control measures of pre-supporting small-tube-shed construction method were also adopted.
出处
《广西水利水电》
2009年第6期79-81,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
隧洞
断层破碎带
施工
Tunnel
shattered fault zone