用模拟退火法解任务的加工时间为模糊区间数的单机提前/拖期调度问题 被引量:3

SINGLE MACHINE EARLINESS/TARDINESS SCHEDULING WITH FUZZY INTERVAL NUMBERS OF PROCESSING TIMES USING SIMULATED ANNEALING
下载PDF
导出
摘要 研究了单机作业下任务的加工时间为模糊区间数的提前/拖期调度问题.目标函数考虑了任务的提前/拖期惩罚、交货期惩罚、完工时间惩罚以及加工时间的模糊区间取值惩罚.目标是找到最优的交货期、最优的排序以及最优的加工时间,使目标函数的值最小.运用了公共交货期(CON)的方法确定了任务的最优公共交货期,运用模拟退火技术确定了任务的最优加工顺序,最后的计算机仿真结果分析了模拟退火算法解该问题的性能. This paper considers earliness/tardiness scheduling problem in which the jobs have fuzzy processing times on a single machine. The objective is to determine the optimal due-date, the optimal sequencing and the optimal processing times to minimize a total objective function based on earliness/tardiness, due-dates, completion times and the deviation of actual processing times from the maximum values of fuzzy interval numbers of processing times. The common due date assigement mathod is used to find the optimal common due date. Simulated annealing technique is presented for finding the optimal sequencing. In the end, we analysis performance measures of simulated annealing method in solving our problem using the computer simulated results.
作者 吴悦 汪定伟
出处 《信息与控制》 CSCD 北大核心 1998年第5期394-400,共7页 Information and Control
关键词 IIT系统 交货期 模拟退火法 调度问题 earliness/tardiness, JIT system, due date, simulated annealing(SA)
  • 相关文献

同被引文献34

  • 1周宏根,戚雪峰,景旭文,王黎辉.基于遗传算法的作业车间调度研究与应用[J].现代制造工程,2006(8):5-8. 被引量:8
  • 2Ishibuchi H,Yamaoto H,Murata H.Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problem[J].Fuzzy Sets and Systems,1994,67(1):81-100.
  • 3Ishibuchi H,Murata H,Lee L H.Formulation of fuzzy flowshop scheduling problems with fuzzy processing time[C].Proceedings of the 5th IEEE International Conference on Fuzzy System,NewYork,NY,USA:IEEE,1996:199-205.
  • 4Tsujimura Y,Gen M,Kubota H.Solving job-shop scheduling problems with fuzzy processing time using genetic algorithms[J].Journal of Japan Society for Fuzzy Theory and Systems,1995,7(2):1073-1083.
  • 5Murata T,Gen M,Ishibuchi H.Multi-objective scheduling with fuzzy due-data[J].Computers & Industrial Engineering,1998,35(3):439-442.
  • 6Adamopoulos G L,Pappis C P.A neighbourhood-based hybrid method for scheduling with fuzzy due-dates[J].International Transactions in Operational Research,1998,5(3):147-153.
  • 7Lam S S,Cai S.Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates[J].Nonlinear Analysis:Real World applications,2002,3(2):307-316.
  • 8Lin F L.A job-shop scheduling problem with fuzzy processing times.Proceedings of International Conference on Computational Science Part Ⅱ[M].Berlin Heidelberg:Springer,2001:409-418.
  • 9Wang C Y,Wang D Y,Ip W H.The single machine ready time scheduling problem with fuzzy processing time[J].Fuzzy Sets and Systems,2002,127(2):117-129.
  • 10Peng J,Liu B D.Parallel machine scheduling models with fuzzy processing times[J].Information Sciences,2004,164(1):1-18.

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部