摘要
托换梁的设计在建筑整体移位工程中对工程造价、工期等都有较大的影响,本文结合工程实例对某砖混结构建筑物在墙体轴线错位情况下的托换体系设计进行了介绍,实践应用取得了良好的效果,可供同类工程参考。
The design of underpinning beam has great influence on construction period,project cost,and other factors in the monolithic moving project of buildings.Combining with construction examples,this essay focuses on the introduction to a successful underpinning system of a brick-concrete structure whose wall axis is dislocated.Furthermore,this achievement can be used as a reference in homologous projects.