4Babu A J G,Suresh N.Project management with time cost and quality considerations[J].European Journal of Operational Research,1996,88(2):320-327.
5《运筹学教材编写组.运筹学[M].北京:清华大学出版社,1990.
6朱兰J M.质量控制手册编译组译.质量管理手册[M].上海:上海科学技术出版社,1979.
7Tarek Hegazy,Member,ASCE,Nagib Wassf.Cost Optimization in Project with Repetitive Nonserial Activities[J].Journal of Construction Engineering and Management,2001,12 (2),181-191.
9[2]X.Hu and R.Eberhart.Multiobjective Optimization Using Dynamic Neighborhood Particle Swarm Optimization.In Proceedings of the 2002 Congress on Evolutionary Computation,part of the 2002 IEEE World Congress on Computational Intelligence,Hawaii,May 12-17,2002.IEEE Press.
10Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.