摘要
文中对阜新发电厂HG670/137-YM16炉投产后结渣,限制负荷的原因进行了剖析,通过现场具体调试措施实施,及相应的运行方式调整,实现了锅炉带大负荷正常运行。指出了影响锅炉带满负荷存在的瓶颈问题及技改措施。
This paper dissects the causes of load limiting and coking of HG670/13 7-YM16 boiler after launching into operation in Fuxin Power Plant.Through the execution of specific field regulation measures and corresponding operation adjusting mode,realized the normal operation of boiler taking large loads.It indicates the existing bottleneck problems influencing the boiler taking loads and the technical improvement measures.
出处
《东北电力技术》
1998年第9期4-7,47,共5页
Northeast Electric Power Technology
关键词
电站锅炉
结渣
调试
设计特点
锅炉
Boiler of power station Coking Regulating & Testing