期刊文献+

北京饭店二期豪华公寓结构设计中的难点处理

Solving Method of Difficulties in Design of Phase Ⅱ Luxurious Apartment of Beijing Hotel
下载PDF
导出
摘要 北京饭店二期豪华公寓结构设计中遇到了几个难点:结构计算中嵌固部位难以明确指定、转换层结构如何设计以及主体结构中一字形短肢剪力墙较多等。针对以上问题,主要从准确模拟计算、满足抗震措施和概念性加强等几个方面着手解决。该工程已经通过验收,使用情况良好。本工程的设计经验可供类似工程参考。 This paper discusses several difficulties, including determination of superstructure and buckling location, design Method of transfer floor structure and excessive beeline-shaped short shear walls in major structure. In view of the difficulties, this paper has put forward some countermeasures, such as computation simulation precisely, meeting anti-seismic construction measure and strengthening concept design. The project has passed the acceptance check, and is now under operation. To sum up, the paper can be used for reference by the similar projects.
出处 《工程建设与设计》 2010年第1期23-26,共4页 Construction & Design for Engineering
关键词 嵌固部位 一字形短肢剪力墙 抗震措施 概念设计 buckling location beeline-shaped short shear wall anti-seismic construction measure concept design
  • 相关文献

参考文献2

  • 1GB50011-2001.建筑抗震设计规范[S].[S].,..
  • 2JGJ3-2002.高层建筑混凝土结构技术规程[S].[S].,..

共引文献2773

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部