摘要
针对煤矿巷道锚杆支护初锚力的作用、工程中锚杆支护初锚力的状况和影响因素进行了分析,并基于新立煤矿现场实际分析和工程实例,提出了提高锚杆初锚力的方法与原则,取得了较好的效果。
for the initial anchor bolt support the role of project initial anchor bolting the status and impact factors were sub -- Analysis, and based on the new legislation the actual mine site analysis and engineering examples proposed to improve initial anchor bolt method and principles, and achieved good results.
出处
《中国矿业》
北大核心
2009年第11期73-75,共3页
China Mining Magazine
关键词
初锚力
锚固力
主动支护
initial anchor
anchoring force
active support