多阶段制造系统调度模型与资源价格研究 被引量:2

Scheduling Model and Resource Pricing in Multi Stage Manufacturing Systems
下载PDF
导出
摘要 为时变需求下的多阶段、多工件种类且生产能力可追加的制造系统调度问题构建了一个令总成本最小的数学模型.通过分析最优性条件,得到了工作站生产能力的价格,并解释了它的经济含义.将调度模型转换为一个时空扩展网络上的静态的费用极小流问题,然后用改进的FrankWolfe算法求解. This paper presents a scheduling model of multi stage manufacturing systems with multiple job classes and variable production capacity constraints at workstations. The model aims to minimize the total cost which is the sum of all costs incurred in holding, processing and schedule delay over the whole study horizon. On the basis of analyzing optimality conditions, the prices of production capacities or resources are derived and explained in economic meaning. It is shown that the model can be transferred into an equivalent static minimum cost network flow problem over a space time network which is a temporal expansion of the base workstation network. An adapted network approach based on the Frank Wolfe algorithm is proposed to solve the equivalent problem and tested on a numerical example.
作者 黄海军 徐刚
出处 《北京航空航天大学学报》 EI CAS CSCD 北大核心 1998年第5期579-583,共5页 Journal of Beijing University of Aeronautics and Astronautics
基金 中国航空基础科学基金
关键词 运筹 管理科学 制造系统 调度模型 资源定价 problems of operations research industrial engineering management science scheduling models of manufacturing systems resource pricing space time expanded network approach
  • 相关文献

参考文献4

  • 1黄海军,Eur J Oper Res,1998年,105卷,52页
  • 2黄海军,J Oper Res Soc,1995年,46卷,977页
  • 3黄海军,城市交通网络平衡分析理论与实践,1994年
  • 4黄海军,Int J Transportation Research-B,1992年,26卷,325页

同被引文献18

  • 1王世进,奚立峰,陶丽华,傅仕伟.互替机床提前/延期惩罚调度问题的启发式算法[J].中国机械工程,2004,15(22):2001-2005. 被引量:2
  • 2Britran G R,Hax A C.On the design of hierarchical production planning systems [J].Design Sci,1977,8(1):35-48.
  • 3Huang H J,Xu G.Aggregate scheduling and network solving of multi-stage and multi-item manufacture system [J].European J Operational Research,1998,105(1):52-65.
  • 4Huang H J,Lam W H K.Modified evans algorithm of solving the combined trip distribution and assignment problem [J].Int J Transportation Research B,1992,26(4):325-337.
  • 5Huang H J.A combined algorithm for solving and calibrating the stochastic traffic assignment [J].J the Operation Research Society,1995,46(8):977-987.
  • 6Lasserre J B.An integrated model for job shop planning and scheduling [J].Management Sci,1992,38(8):1 201-1 211.
  • 7Adams J,Balas E Zawack D.The shifting bottlleneck procedure for job-shop scheduling [J].Management Sci,1988,34(3):391-401.
  • 8Salomn M,Kroon L G,Kuck R,et al.Some extensions of the discrete lotsizzing and scheduling [J].Management Sci,1992,37(7):801-812.
  • 9Syarif A,Yun Y S,Gen M.Study on multi-stage logistic chain network:a spanning tree-based genetic algorithm approach.Comput Ind Eng,2002,43:299
  • 10Hoquea M A,GoyalInt S K.On lot streaming in multistage production systems.J Prod Econ,2005,95:195

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部