期刊文献+

基于模糊理论的大跨度桥梁评估理论研究 被引量:20

Study of Assessment Theory of Long-span Bridges Based on Fuzzy Theory
下载PDF
导出
摘要 介绍了模糊综合评估理论及其计算步骤,并从评语等级的确定、隶属函数的建立到合成算子的选择等方面,研究探讨了现有模糊综合评估存在的问题,并建立了一套适用于大跨度桥梁综合评估的模糊综合评判方法。以哈尔滨松花江斜拉桥为例,利用模糊综合评估方法对该桥进行了综合评估,评估结果合理、可靠。实例证明,这种评估方法能够为大跨度桥梁运营的技术状况及养护管理工作提供科学、实时、定量的评估,确保桥梁的安全运营。 Fuzzy comprehensive assessment theory and calculation approach were introduced first. The existing problems of fuzzy comprehensive assessment, including assessment grade determination, membership function establishment and composite operator choice, etc., were discussed. A set of fuzzy comprehensive assessment method applied to long-span bridges was established. The fuzzy comprehensive assessment method was applied to Harbin Songhua River Cable-stayed Bridge, and the assessment result is reasonable and credible.The example proves that the method can provide scientific, real-time and quantitative assessment for the operation status, maintenance and management of long-span bridges, ensure the safe operation of bridge, and provide quantitative basis for the decision-making of maintenance and management.
出处 《公路交通科技》 CAS CSCD 北大核心 2010年第1期62-66,共5页 Journal of Highway and Transportation Research and Development
基金 教育部高等学校博士学科点专项科研基金资助项目(20050213008) 黑龙江省交通厅重点科技项目(2004)
关键词 桥梁工程 评估 模糊理论 隶属函数 bridge engineering assessment fuzzy theory membership function
  • 相关文献

参考文献9

  • 1THOMAS L S. The Analytic Hierarchy Process [ M] . 2nd ed. Pittsburgh PA: RWS Pubhcations, 1996.
  • 2谢季坚,刘承平.模糊数学方法及其应用[M].2版.武汉:华中科技大学出版社,2005.
  • 3王永平,张宝银,张树仁.桥梁使用性能模糊评估专家系统[J].中国公路学报,1996,9(2):62-67. 被引量:78
  • 4中华人民共和国交通部.JTGH11-2004公路桥涵养护规范[S].北京:人民交通出版社,2004.
  • 5WANG Yingming, ELHAG T M S. A Fuzzy Group Decision Making Approach for Bridge Risk Assessment [J] . Computers and Industrial Engineering, 2007, 53 ( 1 ) : 137 - 148.
  • 6过秀成,肖慎,张立早,宋辉.多级模糊评判法在公路网规划方案评价中的应用[J].公路交通科技,2003,20(1):45-48. 被引量:26
  • 7任远,黄侨,林阳子.大跨度斜拉桥综合评估系统的研制与开发[J].南京航空航天大学学报,2007,39(4):535-539. 被引量:8
  • 8HUANG Qiao, REN Yuan, LIN Yangzi. Application of Uncertain Type of AHP to the Condition Assessment of Cablestayed Bridges [J] .Joumal of Southeast University: English Edition, 2007, 23 (4) : 599 - 603.
  • 9BEYNON M J. A Method of Aggregation in DS/AHP for Group Decision-making with the Non-equivalent Importance of Individuals in the Group [ J ] Computers and Operations Research, 2005, 32 (7): 1881- 1896.

二级参考文献17

  • 1介玉新,胡韬,李青云,李广信.层次分析法在长江堤防安全评价系统中的应用[J].清华大学学报(自然科学版),2004,44(12):1634-1637. 被引量:61
  • 2赵建强.既有城市桥梁结构常见病害与评估方法综述[J].甘肃科技,2005,21(9):132-134. 被引量:2
  • 3Wan Yucheng,Ma Baoguo,Sheng Zhaohan.Ranking method for the reciprocal judgment matrix based on the unascertained three-valued judgments[J].Journal of Systems Engineering and Electronics,2006,17(1):115-120. 被引量:4
  • 4刘西拉,计算结构力学及其应用,1987年,4期
  • 5王光远,模糊数学,1984年,4期
  • 6Roelfstra G,Hajdin R,Adey B,et al.Condition evolution in bridge management systems and corrosion-induced deterioration[J].Journal of Bridge Engineering,2004,9(3):268-277.
  • 7Yousset M A,Anumba C J,Thorpe T.Intelligent selection of concrete bridge construction methods in egypt[C]//Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering.United States:American Society of Civil Engineers,2005:1751-1764.
  • 8Hurley W J.The analytic hierarchy process:a note on an approach to sensitivity which preserves rank order[J].Computers and Operations Research,2001,28(2):185-188.
  • 9Beynon M J.A method of aggregation in DS/AHP for group decision-making with the non-equivalent importance of individuals in the group[J].Computers and Operations Research,2005,32(7):1881-1896.
  • 10黄侨,任远,吴红林.哈尔滨松花江斜拉桥运营与养护管理系统研究(阶段研究报告)[R].哈尔滨:哈尔滨工业大学,2006.

共引文献128

同被引文献165

引证文献20

二级引证文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部