期刊文献+

华能巢湖电厂2×600MW工程创新和优化设计 被引量:5

Design Innovation and Optimization of Huaneng Chaohu 2×600 MW Unit Project
原文传递
导出
摘要 在华能巢湖电厂2×600 MW新建工程的勘测设计中,采用了先进的工艺技术和设备,对厂区总平面布置、主厂房布置、热力系统、控制系统、水处理系统等进行了优化,并对电缆敷设路径、烟囱结构等进行了精细化设计,大幅降低了工程造价。对工程的创新和优化设计情况进行了详细介绍,以进一步促进600 MW超临界机组新建工程技术经济指标的提升。 During the survey and design of 2 ×600 MW Huaneng Chaohu newly built project, our institute adopted advanced technologies and equipment are used, main building layout, main power block arrangement, thermal system, control system, and water treatment system are optimized and precise design is carried out for cable laying routine and stack structures, which has greatly reduced the engineering cost. The paper introduces engineering innovation and optimized design in details to further promote technical and economical target increase in new 600 MW USC unit constructions.
出处 《电力建设》 2010年第1期72-76,86,共6页 Electric Power Construction
基金 国家工程项目(发改能源[2007]1128号)
关键词 600MW超临界机组工程 节能 设计优化 工程造价 600 MW USC unit project energy-saving design optimization engineering cost
  • 相关文献

参考文献2

共引文献3

同被引文献35

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部