大型建设项目企业动态联盟组建过程研究

The research about enterprise dynamic alliance formation process of large-scale construction projects
下载PDF
导出
摘要 针对我国建筑业当前存在的问题及未来发展趋势,提出大型建设项目企业动态联盟的组织模式,阐述了大型建设项目企业动态联盟的含义和意义,并运用IDEF0分析方法,重点分析了大型建设项目企业动态联盟的组建过程、项目任务分解以及动态联盟合作伙伴的选择。 In view of current problems and future development trend in the construction industry of our country, the paper presents the dynamic alliance organizational model of large-scale construction projects. This paper discusses the meaning and significance of dynamic alliance about the large-scale construction projects, and based on IDEFO analysis methods, specifically analyzes the dynamic alliance formation process of large-scale construction projects, project structure breakdown and the choice method of dynamic alliance's cooperative partners.
出处 《山西建筑》 2010年第3期216-218,共3页 Shanxi Architecture
关键词 大型建设项目 动态联盟 IDEF0 组建过程 large-scale construction project dynamic alliance IDEF0 formation process
  • 相关文献

参考文献5

  • 1林呜,马世华.动态联盟--项目管理新模式[M].北京:电子工业出版社,2003.
  • 2刘逸初,徐渝.模块化──动态联盟有效实施的关键因素[J].工业工程,2000,3(2):13-15. 被引量:10
  • 3B. K. Baiden, A. D. F. Price, A. R. J. Dainty. The extent of team integration within construction projects[J ]. International Journal of Project Management,2006(24) : 13-23.
  • 4Antonie Van, Nico Zwem. Implementing IDEF0 Techniques Simulation Modeling Specifications [ J ]. The Proceedings of 17th International Conference on Computers and IE, 2001 ( 1 ) : 467-471.
  • 5李全龙,叶丹,战德臣,徐晓飞.动态联盟过程模型[J].计算机集成制造系统-CIMS,1999,5(4):29-34. 被引量:15

二级参考文献10

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部