摘要
以施工前期管理为总线,从工程投标、图纸会审、工程施工合同三方面阐述了工程前期管理的问题和对策,以期达到合理投资、有效控制造价、取得最佳投资效益的目的。
With construction prior management as concentration line,the engineering prior management problem and countermeasure were illustrated from engineering bidding,drawing joint checkup and engineering construction contract,so as to reach the goal of proper investing,effective controlling cost and obtaining best investment efficiency.
出处
《山西建筑》
2010年第3期229-230,共2页
Shanxi Architecture
关键词
工程
投标
图纸
合同
管理
engineering
bidding
drawing
contract
management