摘要
结合采用缆索吊装—千斤顶斜拉扣挂法架设空钢管桁架拱肋时扣索索力的重要性,通过分析扣索索力的常用计算方法,明确指出了各种计算方法的优缺点,从而为大桥的施工提供科学的指导。
By combining with the importance of the force of the knotted cable in the cable erection,with the jack stayed knotting method,to construct the hollow steel pipe trussed arch rib,the paper points out respective advantages and disadvantages of all sorts of calculation methods by the analysis of the common calculation methods for the force of the knotted cable,so as to provide scientific direction for the bridge s construction.
出处
《山西建筑》
2010年第3期335-336,共2页
Shanxi Architecture
关键词
钢管混凝土拱桥
扣索力计算
方法
concrete filled steel bridge
calculation of force of knotted cable
methods