摘要
济钢第二炼铁厂400烧结机投产后,主要向3200 m3高炉提供烧结矿,富余的烧结矿供给2、3号1750 m3高炉,由于400 m2烧结机工程比3200 m3高炉投产时间早,为采用最佳的高炉生产模式组织生产,需要对400 m2烧结机向2、3号1750 m3高炉的供料系统进行优化。
Jinan Iron and Steel 400 m^2 second iron sintering machine put into operation,mainly to provide 3200 m3 of blast furnace,sinter abundant supply of 1750m? of blast furnace No.2,3,400 m^2 sintering machine as a result of the project put into production than the 3200 m^3 earlier blast,in order to use the most best mode of production of blast furnace production,the need for 400 m^2 sintering machine No.1750 m3 to 2,3 for the blast furnace feed system to optimize.