摘要
介绍了水轮机无控制环式导水机构的设计及应用。通过进行结构分析及经济比较,说明了取消控制环的导水机构的先进性、经济性和可靠性。
The design and application for the construction of non-gate operating ring in the gate operating mechanism of water turbine is introduced On the basis of analyzing the construction and comparing the economy,proved the advancement,economy and reliability of this kind of construction of non-gate operating ring
出处
《大电机技术》
EI
北大核心
1998年第5期51-55,共5页
Large Electric Machine and Hydraulic Turbine
关键词
水轮机
导水机构
控制环
设计
water turbine gate operating mechanism operating ring