摘要
介绍了电气化牵引区段25Hz相敏轨道电路叠加ZPW-2000A电码化的开通调试。
This article introduces the commissioning and debugging of the ZPW-2000A coding overlapped on 25 Hz phase-sensitive track circuit in electrified section.
出处
《铁路通信信号工程技术》
2009年第6期47-48,共2页
Railway Signalling & Communication Engineering
关键词
轨道电路
电码化
施工
Track circuit, Coding, and Construction