6Joseph A Ficenec, Steven D Kneip, Maher K Tadros, et al. Prestressed Spliced I-girders: Tenth Street Viaduct Project, Lincoln, Nebraska [J], PCI Journal, 1993, 38 (5): 38-48.
7Alan R Phipps, QD Spprill Jr. Biloxi Interstate 110 Voaduct [J], PCI Journal, 1990, 35 (1): 120-132.
8Maher K Tadros, Joseth A Ficenec, Amin Einea, et al. A New Technique to Continuity in Prestressed Concrete Members[J]. PCI Journal, 1993, 38 (5): 30-37.
9Peterman R J, Ramirez J A. Restrained Moments in Bridges with Full-span Prestressed Concrete form Panels [J]. PCI Journal, 1998, 43 (1): 54-73.
10Hyo-Gyoung Kwak, Young-Jae Seo. Shrinkage Cracking at Interior Support of Continuous Pre-cast Pre-stressed Concrete Girder Bridge [J]. Construction and Building Materials, 2002, 41 (1): 35-47.