期刊文献+

多级传力预应力端锚荷载传递性能试验研究与分析 被引量:3

Experimental Research and Analysis on the Load Transfer Behavior of Multiple Stage Prestressing Anchorage
下载PDF
导出
摘要 多级传力预应力端锚是一种新型的锚具形式。试验研究了该类锚具在不同螺旋筋和箍筋配置及其表面形式下的荷载传递性能。结果表明当螺旋筋及箍筋配筋间距为50mm,钢筋采用螺纹钢时,该类锚具荷载传递性能良好。通过数值分析,讨论了该类锚具的应力分布模式,表明约27.4%的张拉荷载通过第二级和端部锚板传递,验证了锚具多级设计的合理性。数值分析进一步表明该类锚具下螺旋筋配筋范围宜在1.0b(b 为正方形试件截面尺寸)左右,首圈螺旋筋离锚具顶部高度宜小于50mm。 The multiple stage prestressing anchorage is a new style of anchorage. The load transfer behavior of this type of anchorage under different spiral and stirrup reinforcement was studied by experiment and numerical analysis. The test result shows that the toad transfer performance is effective when the space of the thread spiral reinforcement and stirrup is 50 mm. The result of numerical analysis shows that about 27.4% tensile loads are transferred through the second and end anchor plate. Consequently, the rationality of multiple stage design is proved. Further numerical analysis indicates that the rational scope of spiral reinforcement is about 1. 0b (b is the section size of the cub specimen), while the rational height of first spiral reinforcement from the top of anchorage is about 50 mm.
出处 《结构工程师》 2009年第6期104-110,共7页 Structural Engineers
关键词 多级预应力端锚 锚固体系 荷载传递 试验研究 数值分析 multiple stage prestressing anchorage, anchorage system, load transfer, experiment, numerical analysis
  • 相关文献

参考文献7

二级参考文献13

  • 1中华人民共和国建设部.JGJ145-2004混凝土结构后锚固技术规程[S].北京:中国建筑工业出版社,2005.
  • 2Werner Fuchs, Rolf Eligehausen, John E Breen. Concrete capacity design (CCD) approach for fastening to concrete [ J ]. ACI Structural Journal, 1995 (2) :73-94.
  • 3Hakki Muratli, Richard E Klingner, Herman L Graves. Breakout capacity of anchors in concrete-part 2: Shear [ J ]. ACI Structural Jounal, NovemberDecember, 200g : 821-829.
  • 4Alqedra M A, Ashour A F. Prediction of shear capacity of single anchors located near a concrete edge using neural networks [ J ]. Computers and Structures, 2005,83 : 2495-2502.
  • 5Eligehausen R, Fuchs W. Load-bearing of anchor fastenings under shear,combined tension and shear or flexural loading [ J ]. Betonwerk + Ferteil - Technik, 1988,2 : 48 -56.
  • 6Timothy J L, Edwin G B. Some design considerations for anchors in concrete [ J ]. ACI Structural Journal, 1991,88( 1 ) :91-97.
  • 7Tamon Ueda, Boonchai Stitmannaithum. Experimental investigation on shear strength of bolt anchorage group [ J ]. ACI Structural Journal, 1991,5-6 : 292-500.
  • 8Richard E K, Mendonca J A. Shear capacity of short anchor bolts and welded studs:a literature review[ J]. ACI Proceeding,1982,79(5 ) :339-349.
  • 9ACI Committee 355. State-of-art report on anchorage to concrete [ S ]. ACI 355.1R-91, Reapproved, 1997: 3-35.
  • 10Rolf Eligehausen, Rainer Mallee, John F Silva. Anchorage in Concrete Construction [ M ]. Berlin : Ernst & Sohn,2006.

共引文献24

同被引文献14

引证文献3

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部