摘要
介绍了晋城变电站围绕提高二次设备安措装设质量这一课题,运用PDCA循环法则开展质量管理活动,对影响二次设备安措装设质量的因素进行了分析,制定对策,并检查了实施效果。
This paper introduces the subject of improving the installation quality in secondary equipment's maintenance prevention of Jincheng Substation,uses PDCA cycle rule to develop quality management activity,analyzes the factors influencing the installation quality in secondary equipment's maintenance prevention,makes out the countermeasures,and checks up the effects.
出处
《科技情报开发与经济》
2009年第36期175-176,共2页
Sci-Tech Information Development & Economy
关键词
变电站
二次设备安措
装设质量
晋城市
substation
secondary equipment's maintenance prevention
installation quality
Jincheng City