摘要
本文介绍了对阿尔及利亚苏夫一期工程地下水位抬高区的泵站,采取轻型井点降水方法,使地下水位降到坑底以下,达到边坡稳定、沙层密实,然后再完成基坑开挖。文中重点介绍了轻型井点降水的计算和施工方法。
The paper introduces the Light Well Point Drainage Method that applied in Phase I pump project in the groundwater level rising zone in Algeria Suf.In this method,the foundation pit should be completed until the groundwater level has drawn down to the bottom of the pit and the slope has been stable and the sand layer been dense enough.The calculation and operation method of light well point drainage are introduced in details in the paper.
出处
《东北水利水电》
2010年第1期68-70,共3页
Water Resources & Hydropower of Northeast China
关键词
轻型井点降水
管网工程
苏夫河谷
Light well point drainage,pipe-network project,Suf river valley