摘要
通过对泰安抽水蓄能电站上库库底土工膜防渗施工的严格监理和合理控制,实现了该电站水库土工膜、混凝土面板及帷幕灌浆防渗的综合运用,达到了预期的防渗效果。
Through the strict supervision and reasonable control of the construction of the bottom anti-seepage with geo-membrane for the upper pond of Tai'an Ptunped Storage Hydropower Station, the comprehensive application of geo-membrane, concrete face and curtain grouting to the anti-seepage of the reservoir for pumped storage hydropower station is realized with the expected effect of anti-seepage.
出处
《水利水电技术》
CSCD
北大核心
2010年第1期58-60,共3页
Water Resources and Hydropower Engineering
关键词
土工膜
工艺要求
质量控制
防渗
泰安抽水蓄能电站
geo-membrane
technological requirement
quality control
anti-seepage
Tai' an Pumped Storage Hydropower Station