摘要
对某地铁车站基坑变形的实测数据,如地表沉降、建筑物沉降、圈梁沉降及水平位移、围护桩体深层水平位移进行了整理,分析了监测数据产生异常的原因,并据此对基坑的安全性进行了评价,积累了地铁车站基坑施工经验。
A subway station foundation pit deformation observation data was arranged,such as ground subsidence,building subsidence,ring beam subsidence and horizontal displacement,guard post deep horizontal,the monitoring data abnormality reasons were analyzed,based on which the foundation pit safety was evaluated,which accumulated subway station foundation pit construction experience.
出处
《山西建筑》
2010年第4期123-124,共2页
Shanxi Architecture
关键词
地铁
基坑
地表监测
围护结构监测
subway
foundation pit
ground monitoring
guard structure monitoring