摘要
为保证直埋供热管网运行的安全性,并充分发挥管材的承载能力,介绍了国电榆次热电厂配套供热管网中直埋热水管道的受力计算和应力验算,提出了针对性的建议。
In order to ensure safety of the directly buried installation heat-supply pipeline operation,and fully play loading performance of pipeline material,introduces forcing calculation and forcing checking of the directly buried installation heat-supply pipeline in the matching heat-supply pipeline network of the National Yuci thermal power plant,and puts forward suggestion.
出处
《山西建筑》
2010年第4期201-202,共2页
Shanxi Architecture
关键词
供热管道
受力计算
应力验算
安全
heat-supply pipeline
forcing calculation
forcing checking
safety