摘要
根据青龙电站引水隧洞涌水塌方的实际工程,提出了处治坍塌和涌水的综合治理方案,取得了良好的处理效果,并提出针对该类地质条件的合理施工方案,确保了后期工程的顺利进行。
Based on the actual collapse section gushing water in diversion tunnel project of Qinglong power station,proposed treatment of collapse and the gushing water comprehensive management program,achieved good treatment effect and proposed,right geological conditions for such a reasonable construction program,to ensure that the latter part of the project proceed smoothly.
出处
《山西建筑》
2010年第4期303-304,共2页
Shanxi Architecture
关键词
隧道
坍塌
涌水
综合治理技术
tunnel
collapse
gushing water
integrated governance of technology