摘要
以青岛海湾大桥为工程背景,介绍了膺架法进行跨铁路现浇箱梁施工的技术要点,通过施工技术措施的实施,确保了既有铁路线运营安全,满足了跨铁路桥梁的施工质量和进度要求。
Taking Qingdao Haiwan Bridge as the engineering background,the paper introduces the technological points for the falsework method in the over-railway cast-in-place box girder,through construction technology implement, to ensure the safety of the existing railway operation,and to meet the requirement of quality and progress of the over-railway bridge construction.
出处
《山西建筑》
2010年第4期322-323,共2页
Shanxi Architecture
关键词
跨铁路现浇箱梁
膺架法
满堂支架
施工
over-railway cast-in-place box girder
falsework method
full framing
construction