摘要
由于河道主流摆动不定,历来尽量避免在顺直河道上建设港口。但随着经济的发展,原来认为建港条件不好的顺直河道岸段亦开始逐渐开发。以靖江电厂码头的建设为例,分析在顺直河道建设码头的可行性。
Since the mainstream is wagging, building ports in straight fiver course has always been avoided. However, with the economic development, the fiver sections of straight river course which were originally considered as with poor conditions have been developed step by step. This paper analyzes the feasibility of building wharves in the straight river course by taking the construction of Jingjiang Power Plant Wharf as an example.
出处
《水运工程》
北大核心
2010年第1期54-57,共4页
Port & Waterway Engineering
关键词
顺直河道
建港
可行性
straight river course
building ports
feasibility