摘要
针对合成氨装置CO2再生系统在设计、开车过程中存在的问题预先进行分析,并在实施项目过程中同步进行整改,取得了较好的效果。此经验值得推广和借鉴。
Through analysis on the problems of CO2 regenerating system in design and operating ever occurred in other natural gas based ammonia plants,Gansu Liuhua Group Co.,Ltd prepared the improving measures before the project being introduced that were carried out in the course of construction.The result shows that the effect is good.The experiences are helpful for other plants planning revamping and building.
出处
《中氮肥》
2010年第1期33-35,共3页
M-Sized Nitrogenous Fertilizer Progress
关键词
脱碳
再生
水冷器
设置问题
管径偏小
CO2 removal
regeneration
water cooler
position problems
under size in pipe diameter