高速铁路路基处理中预应力管桩桩筏结构的应用 被引量:3

The Application of the Pre-stressed Pipe Raft Structure to the High-speed Railway Roadbed
下载PDF
导出
摘要 京沪高速铁路宿州站,地质条件较差,为保证高速铁路运行的高平顺性和铁路路基工后零沉降,车站路基地基处理采用了PHC预应力管桩桩筏结构。文中对该工程施工中的预应力管桩桩筏结构施工工艺进行了详细介绍,并给出了施工注意事项及施工经验数据,可为同类工程提供一定的实例参考。 The Suzhou Station of the Beijing-Shanghai High-speed Railway is located where the geological conditions are very poor, in which case pre-stressed PHC pipe pile raft structures are used to treat the foundation of the roadbed of the station to ensure the smoothness of the high-speed railway and no post-construction settlement of the railway roadbed. The construction techniques for the pre-stressed pipe pile raft structure are described in detail in the paper, with points for attention in construc- tion and empirical data of the construction presented. This paper may serve as a useful reference for other similar projects.
作者 马天明
出处 《国防交通工程与技术》 2010年第1期59-63,共5页 Traffic Engineering and Technology for National Defence
关键词 路基处理 预应力管桩桩筏结构 管桩 筏板 treatment of the roadbed pre-stressed pipe pile raft structure pipe pile raft plate
  • 相关文献

参考文献4

二级参考文献2

共引文献262

同被引文献23

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部