大断面土质隧道施工方法的选择与施工期监测结果分析 被引量:4

Selection of construction method for large section tunnel in soil and analysis of monitoring results during construction period
下载PDF
导出
摘要 本文以某大断面土质隧道施工为研究对象,通过对台阶法、弧形导坑法和中隔壁墙法三种土质隧道常用开挖方法的数值模拟结果的对比分析,确定了弧形导坑法为适合本工程的较优施工方法,进而结合其在隧道施工中的监控测量结果,得到了大断面土质隧道施工期间围岩及支护结构的应力发展规律和变形特性,为围岩稳定提供了可靠信息,保证了隧道施工的安全,并通过施工期实际监测结果与相应数值模拟结果的对比,验证了数值模拟结果的可靠性,为今后类似工程的设计和施工提供了类比依据。 Taking large-section soil tunnel construction as research background, the numerical simulation on three excavation methods for tunnel in soil including bench method, arch heading method and mid-wall method were carried out, and the arch heading method is confirmed as optimum construction method for this project by comparative analysis on the simulated results of the three methods. And then, according to analysis of monitoring measurement results of the construction being applied arch heading method, stress development laws and deformation characteristics of surrounding rock and supporting structure of large section tunnel in soil were obtained, which provide authentic communication on the stability of surrounding rock and guarantee for the safety in tunnel construction. Besides, the reliability of the simulated results is verified by comparing with monitoring measurement data, all of which offers analogical reference for design and construction in the future.
出处 《工程勘察》 CSCD 北大核心 2010年第2期19-24,89,共7页 Geotechnical Investigation & Surveying
关键词 土质隧道 施工 数值模拟 监测 soil tunnel construction numerical simulation monitoring
  • 相关文献

参考文献7

二级参考文献6

共引文献95

同被引文献26

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部