费用现值法在材料价差调整项目中的运用

Application of the Cost Present Value to the Material Price Dicrepancy Adjusting Project
下载PDF
导出
摘要 目前,我国大型建设工程的投标报价基本按工程量清单计价规范要求计价,合同中大多注明主要材料可根据施工期间市场价格进行价差调整。但如何加强材料价差调整的管理,当前还未引起建设单位足够的重视。运用费用现值法,结合工程实例,对材料价差调整管理中的决策提供理论依据,并为今后类似工程提供借鉴。 At present, the bidding price of large construction proiects is calculated based on the code of valuation with bill quantity of construction in our country. The price of the primary materials can be adjusted during the construction of a project based on the market information. The owner doesfft attach enough importance to how to reinforce the management to the adjustment of material price discrepancy. The method of the cost present value is pres- ented as the theory basis of the decision-making in the manage- ment to the adiustment of material price discrepancy. A project instance results show the method proposed by the paper is reason- able and effective.
出处 《西部探矿工程》 CAS 2010年第2期217-220,共4页 West-China Exploration Engineering
关键词 费用现值 大型建设工程 清单计价 材料价差 价差调整 present value of cost large construction projeets valuation with bill quantity material price discrepancy price di- crepancy adjusting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部