期刊文献+

基于延迟设计分离点的订单设计型产品配置设计 被引量:8

Configuration design of engineering-to-order product based on postponement design decoupling point
下载PDF
导出
摘要 针对复杂订单设计型(ETO)产品定制设计周期长的不足,提出了一种支持ETO产品快速配置设计的方法.利用大批量定制设计原理和延迟设计分离点(PDDP),将组成ETO产品的零部件划分为不同定制深度的4种设计类型,使针对ETO产品的整体设计转变为对零部件的配置变型设计.通过将ETO产品定制设计过程划分为非精确配置过程和精确配置过程2个阶段,延迟了定制零部件在企业内部的设计过程,变反应式设计为预定式设计,降低了客户订单对产品设计的影响,缩短了定制设计周期和交货期.结合工业汽轮机转子为例说明了方法的有效性和可行性. Complex engineering-to-order (ETO) product has long design cycle. A rapid configuration design method was presented to solve the problem. The components of ETO product were divided into four design types with different customized depth by utilizing the theory of design for mass customization (DFMC) and postponement design deeoupling point (PDDP). Then design for ETO product itself can be converted into customized design for its components. The configuration design process of ETO product was divided into two phases, namely, inexact and exact configuration. Then design process of customized components in enterprise was effectively postponed and responded design was transformed into scheduled design. Thus customer order's influence on design was decreased as possible and customized design cycle and lead time were shortened. An example of the rotor of industry turbine was given to verify the effectiveness of the method.
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2009年第12期2231-2236,共6页 Journal of Zhejiang University:Engineering Science
基金 国家"863"高技术研究发展计划资助项目(2007AA040607) 国家自然科学基金资助项目(50805133) 浙江省自然科学基金资助项目(Y107575) 浙江省教育厅高校科研计划资助项目(20070333)
关键词 大批量定制 ETO产品 配置设计 延迟设计分离点 mass customization (MC) engineering-to-order (ETO) product configuration design postponement design decoupling point(PDDP)
  • 相关文献

参考文献13

  • 1LAU R, RONALD S M. Mass customization: the next industrial revolution [J]. Industrial Management, 1995, 37(5) : 18 - 19.
  • 2MESIHOVIC S, MALMQVIST J. PDM system based support for the sales-delivery process of engineer-to-order products [ C ]//Proceedings Produktmodeiler Linkoping. Sweden: [s. n. ], 2000: 157-172.
  • 3DESIGN Power Inc. Instant engineering-to-order over the web [EB/OL]. [2005-06-10]. http: //www. dp. com/pdf/customwise /CustomWise. pdf.
  • 4JOSEPH N, XIE H. Product configurators pave the way for mass customization [EB/OL]. [2003-08-21]. http:/// www. ntrustin fotech, com/pdfs/art/doc23, pdf.
  • 5STROM U, AXWORTHY A. Product configuratorsthe big picture[R], USA: Design Power Inc. , 2000.
  • 6ENCOMPIX. Engineer-to-Order ERP now to include configurator[EB/OL]. [2005-05-30]. http: // www. 24- 7presssrelea se. com/view_press_release, php? rID= 5495.
  • 7WIKNER J, RUDBERG M. Integrating production and engineering perspectives on the customer order decoupling point [J]. International Journal of Operation & Production Management, 2005, 25(7) : 623 - 641.
  • 8SCHOETTNER J. Rapid product developing method [R]. Germany: Engineering Consulting & Solutions, 1996.
  • 9PRASSAD B. Concurrent engineering fundamentals: integrated product and process organization [M]. New Jersey: Prentice Hall, 1996,.
  • 10BSHARAH F, LESS M. Requirements and strategies for the retention of automotive product data [J]. Computer-Aided Design, 2000, 32(2) : 145 - 158.

二级参考文献7

共引文献19

同被引文献141

引证文献8

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部