摘要
根据大桥主桥预应力合拢段施工工艺,阐述预应力混凝土连续梁的合拢段施工顺序、影响因素等问题及合拢支撑措施、体系转换和预应力施工等的施工工艺,为以后同类连续梁的合拢施工提供参考。
According to the construction technology for the prestressed main closure section, the construction order, influence factors of the closure section in the prestressed concrete continuous beam construction, as well as construction technologies for support measures for closure, system conversion and prestressed construction are described, so as to provide references for similar continuous closure construction.
出处
《北方交通》
2010年第1期36-39,共4页
Northern Communications
关键词
预应力混凝土连续梁桥
悬浇
吊模
合拢段
合拢支撑
预应力张拉
Prestressed concrete continuous beam
Cantilever
Form traveler
Closure section
Closure support
Prestessed tension