摘要 介绍兴安直流输电工程深圳换流站、高肇直流输电工程肇庆换流站极控独立快速通信通道(directly ultra-speed telecommunication,DUST)通信电源系统的冗余性改造。基于在DUST电源在设计上的非冗余性,提出了相应的解决方案,并且通过试验进行验证、分析,证明其可行性及必要性。 The improvement plan of pole control directly ultra-speed telecommunication (DUST) power at Shenzhen Converter Station in Xing-An HVDC Project and Zhaoqing Converter Station in Gao-Zhao HVDC project is introduced. The non-redundancy and its defect at the design level of DUST power supply is explained, the improvement plan is put forward. The feasibility of the improvement is varified by further analysis and tests.
出处 《南方电网技术》 2009年第6期110-112,共3页 Southern Power System Technology
关键词 高压直流输电 极控 DUST 直流电源 HVDC system pole control DUST DC power supply
  • 相关文献

参考文献3

二级参考文献10

共引文献111

同被引文献4

  • 1DL/T50442004,电力工程直流系统设计技术规程[S].
  • 2Q/D-2012,南方电网变电站直流电源系统技术规范[S].
  • 3樊冬梅.直流换流站交直流电源一体化实施方案探讨[A].首届直流输电与电力电子专委会学术年会论文集[C].2012.
  • 4聂定珍,马为民,李明.锦屏—苏南特高压直流输电工程换流站绝缘配合[J].高电压技术,2010,36(1):92-97. 被引量:49

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部