摘要
通过对莱钢编组站能力分析,对一铁区线路状况进行详细调查,从运输组织和线路改造等进行探讨,分别提出几种方案,并进行对比分析,寻找出最优的方案,改造后大幅提高运输能力,满足莱钢生产需要。
The status of the railway in the first iron section was probed via an analysis of the capacity of the Laigang classification yard.Based on the exploration of transport organization and railway betterment,several schemes were advanced.Through comparison and analysis,optimal ones were found out.After reform,transportation capacity was considerably enhanced,meeting the needs of Laigang s production.
出处
《莱钢科技》
2009年第6期39-40,69,共3页
Laigang Science & Technology
关键词
编组站
增效扩能
研究
classification yard
effect increase and capacity expansion
research